Snow Removal & Winter Road Maintenance
The District
of Lakeland No. 521 is responsible for snow and ice control on all
municipal roads, public lanes, and District-owned parking lots to help maintain
safe and passable conditions throughout the winter season. This service
is guided by Council’s Snow Removal Policy, adopted by resolution on November
12, 2025.
Service Levels & Timelines
- The District’s operational target is to clear all municipal roads within 72 hours following a snowfall, weather and equipment permitting.
- If snowfall continues or a second winter storm occurs before operations are complete, response timelines may restart.
- Snow and ice control activities may be delayed or suspended when conditions are unsafe, including extreme cold, poor visibility, or reduced equipment effectiveness.
How Snow Removal Is Prioritized
Snow and ice control operations are prioritized based on:
- Public and personal safety
- Emergency vehicle access
- Refuse collection routes
- Weather and road conditions
- Available equipment, staffing, and operational capacity
Early-Season Snowpack Management
At the beginning of the winter season, the District allows a snowpack of approximately 4–6 inches (10–15 cm) to remain on municipal roads. This protects road structure, reduces gravel loss, and supports more effective plowing throughout the winter. Snow removal begins once accumulation exceeds this level or when safety concerns require earlier action.
Driveways & Snow Ridges (Windrows)
Public Works uses snow gates to reduce ridges across driveways; however, some ridging is unavoidable.
- Property owners are responsible for clearing normal driveway ridges up to 20 cm (8”).
- If a ridge exceeds this height or is missed, residents may contact the District Office for review when equipment becomes available.
- During major winter storm events, restoring roadway access takes priority over addressing driveway ridges.
Sanding & Salting
Sand and/or salt is applied as required to improve traction during icy conditions. Salt use may be limited during extreme cold temperatures when it becomes ineffective.
Parking & Snow Removal Operations
- Residents are asked not to park on municipal roadways during snow removal operations, as parked vehicles delay clearing and create safety hazards.
- Vehicles obstructing snow removal are the responsibility of the owner and may be required to be removed in accordance with The Highways and Transportation Act, 1997.
Parking Lots
Snow clearing and ice control at the District Office parking lot is prioritized to maintain public access during regular business hours. All other District-owned parking lots are addressed after municipal roads have been opened and made passable.
Private Property Responsibilities
- Snow from private property must not be placed on municipal roads, lanes, ditches, or walkways.
- Landscaping, fencing, or obstructions must not be installed within road allowances.
- Snow piles on private property must not obstruct drainage or sightlines and may need to be relocated if issues arise.
Operations & Scheduling
Snow removal operations may occur outside regular business hours, including evenings, weekends, and statutory holidays. Forecasted snowfall of 4 inches (10 cm) or more within 24 hours may trigger early operational response beginning around 6:00 a.m.
This page summarizes the District’s Snow Removal Policy and is intended to provide general service information. Service levels are subject to weather conditions, operational requirements, and emergency response needs.
Your Role in Snow Removal
Objects in the roadway like vehicles, large rocks, sheds, and material can damage our snow clearing equipment, affect the quality of snow clearing, and increase the time required to clear snow.
Property owners are responsible for clearing and removing snow from driveways and yards.
Pushing or dumping snow onto or into Public Reserves, across roadways or road allowances, and private property is prohibited.
Please ensure your approach and the front of your property are clear of these objects. A minimum of five feet of clear space along the front of your property to the edge of the developed roadway will help us be more efficient.

